Carpentry and timber construction · South Tyrol
Quantity take-off from building plans for the quote
Part of: AI automation
Also relevant for: Software & web apps
The starting situation
For every quote the company redraws the architect's plans in CAD: exterior walls, interior walls, roof, floor build-up, balconies, scaffolding. That takes one to four hours per quote before any pricing starts.
How we solve it
A plan engine reads the architect's DWG files and vector PDFs, detects walls from the section hatching and calculates areas and lengths for each quote item. The company's own rules, for example on deducting openings, are recorded once and applied.
What you get
The quantities are ready before anyone redraws a line. Every area is coloured in the plan and can be checked, so the specialist reviews instead of drawing.
Do you recognise a similar process in your company?
If this use case feels close to your daily work, we can assess data availability, effort and a realistic first MVP together.
Why AI projects work →Starting point
To prepare a quote, a carpentry company receives the architect's plans, usually as PDF, sometimes as DWG. Pricing needs quantities first: square metres of insulated and uninsulated exterior wall, interior walls, roof area over the living space and the overhang, floor build-up per storey, balcony floors, running metres of railing, scaffolding area.
Today the person in charge imports the plans into CAD. There they arrive as hundreds of thousands of loose lines, with no meaning and often at the wrong scale. So the floor plan is copied several times and traced on a separate layer for each category. In the end the results sit as text next to the drawing. Depending on the project this takes one to four hours per quote, and only a few people in the company can do it.
The solution
Alpino AI builds a plan engine that reads plans regardless of format and derives quote quantities from them:
- The input is the documents as they arrive: the architect's native DWG, a PDF imported into CAD, or the vector PDF itself. All three feed into the same plan model.
- Walls are detected from the grey section hatching. Terrain, furniture, dimensions and neighbouring buildings have other colours or sit apart, so they drop out. From the walls the engine derives outline, wall thickness, interior area and perimeter per storey.
- The scale is calibrated from a dimension or a known measurement, because imported PDFs are rarely to scale.
- The company's rules are recorded once with the specialist and stored in code per client: which openings are deducted, when values are rounded up, what counts as insulated roof and what as overhang. The AI does not guess these rules.
- The result is a quantity list per quote item and a preview in which every counted area is coloured in the plan.
Process and pilot
The starting point is finished quotes for which the company has already worked out the quantities by hand. The plan engine recalculates the same plans, and the values are compared on three levels: was the same geometry found? Do the measurements in metres and square metres match? Do the quote values match under the company's rules? Then comes the real test with new plans whose result nobody knows in advance.
What can be measured: how long the take-off takes per quote, how far the values deviate from the manual calculation and how often lines still have to be traced.
What stays with people
The specialist checks every quantity before it goes into the quote. Because every area is marked in the plan, they see at a glance what was counted and what was not. Special cases such as dormers, unclear plan versions or a second building on the same sheet are their call. Prices, build-ups and surcharges remain the company's decision.
Connection to existing systems
The plan engine runs on a server in the EU and works on copies of the plans; the originals stay unchanged. Results go into the pricing as a list or back into the DWG as an extra layer, so they can be checked in the familiar CAD. How we secure applications like this is described on the Software & web apps page.
Transferable to other companies
The pattern fits wherever quotes are built from plans and someone measures areas or lengths by hand today: timber construction and carpentry, drywall, roofing and sheet metal, facades, scaffolding, flooring, painting and construction companies of any size. A related case from electrical planning, where a bill of materials is created from the floor plan, is described under Cost estimate in the first meeting. The service overview is on the AI automation page.
If you would like to check whether your quantity take-off can be prepared this way, let's book a 30-minute first call. Bring a finished quote with its plan: that is the quickest way to show it.
This use case is based on a real client project. Sector and region are named, the company itself remains anonymous.